Skip to content Skip to footer

Plug and play

Electrical Review Logo

Merlin Power Management’s new ‘Plug & Play’ generator rental system enables an on-site generator installation to be up and running in less than 30 minutes.
Developed by Merlin’s technical team to make on-site installation quicker and easier, the cables, plugs and sockets are colour coded for foolproof installation. The ‘plug and play’ system enables installation between Merlin’s generators, the AMF panel and the customer’s load to be carried out using only five plug/socket connections.

Merlin Power Management
08700 623349

Top Stories

Electrical Review is the go-to source for electrical engineers, with more than 150 years of dedication to the industry.


© SJP Business Media.