Skip to content Skip to footer

Lighting connection and control

Electrical Review Logo

flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football stadium. The project includes a 3000sqm specialist education centre, linked to the stand.

The building was designed to reach a BREEAM excellent standard.

flex7 absence and daylight linking lighting control was installed throughout the building. 

The consultant required a local emergency key switch with manual dimming and absence control in all offices, store rooms and WC areas. Only 1 switch drop was needed to control both dimming and emergency switching in any room where an fnc2000/E was used. Because the fnc2000E operates at protected extra low voltage, it does not need to be enclosed, or require an RCD to be compliant with the 17th edition wiring regulations.

flex7 products were chosen because of the flexibility of the product range and because the system is pre-fabricated, which ensured quick and easy installation on site.

Flex Connectors 

020 8580 1066

www.flexconnectors.co.uk

 

 

 

 

 

 

 

 

Top Stories

Stay In The Know

Get the Electrical Review Newsletter direct to your inbox, and don't miss a thing.