Wieland Electric has supplied its popular Metalynx2 modular wiring system and a variety of the company’s GST products for Project Hana, a two floor CAT B fit out commercial property at St Martin’s Court in the City of London in a prime location next to St Paul’s Cathedral. 

The Wieland products were specified and installed by Phoenix ME Ltd with the Metalynx2 system used to feed the lighting control modules and fan coil units throughout the building whilst the GST system was used in all prefabricated modular areas to provide a connection for linear light fittings.

Hana, a subsidiary of CBRE Group, offers a full range of flexible working solutions and St Martin’s Court is the company’s third facility, comprising over 100,000 sq ft of private offices, on-demand meeting rooms and sophisticated co-working spaces that are available by the hour, day, or week. The Hana facility will initially be fully occupied by approximately 500 CBRE employees who will operate from the space while the company’s existing UK headquarters at Henrietta House in the West End is undergoing redevelopment work. Hana at St Martin’s Court’s amenity-rich, premium shared space will become available to other occupants in early 2021.

Thanks to its innovative design, Metalynx2 uses a minimum number of components, all of which lock together for secure installation and in full compliance with all relevant standards, representing a smarter generation of structured wiring that delivers even greater savings on costs and installation time. It is ideal for power distribution, lighting control (including DALI and KNX) and fan coil units and, with the ability to customise Metalynx2 components for special projects, it offers infinite design flexibility.

As Project Hana was a fast pace refurbishment, it was paramount that all systems and components would arrive on site in the agreed timescale. Wieland designed, plotted and fabricated all requirements off site which when delivered, allowed for easy installation by Phoenix to ensure connection simply from the home run being installed back to the distribution board and the final runs to the lighting control modules and fan coil units. As all connections and end runs have a plug and play based system, this also allowed for second fix connections to be completed quickly and effortlessly.

Metalynx2 provides any scheme with complete flexibility so should a design need to be changed at time of fitting or in the future, the system can be modified quickly with minimum downtime. With Wieland’s prompt delivery service this also assisted other contractors working on Project Hana as this ensured no time was wasted waiting for product on-site and allowed for final connection in line with the programme of works. Wieland also provided on-site project management and technical support.