Managing construction risk
Brsia has announced Dr Michelle Agha-Hossein, building sustainability engineer, is speaking at the double breakfast seminar on Managing Construction Risk – Strategies and Soft Landings – hosted by Clarkslegal and Bsria, at the Reading and London offices.
The seminars are being staged, in light of recent events, to offer practical tips and manage the risk of insolvency.
31 Wednesday January 2018, 8:00 am – 10:30 am Clarkslegal, One Forbury Square, The Forbury, Reading, RG1 3EB
7 Wednesday February 2018, 8:00 am – 10:30 am Clarkslegal, 12 Henrietta Street, Covent Garden, London, WC2E 8LH
The late Sir Michael Latham said: "no construction project is risk free. Risk can be minimised, shared, transferred or accepted. It cannot be ignored".
This remains the case. Managing risk has even more significance in the current financial climate – especially with challenges facing the industry such as labour shortages and Brexit.
Soft Landings is a building delivery process which runs through the project, from inception to completion and beyond, to ensure all decisions made during the project are based on improving operational performance of the building and meet the client’s expectations. Bsria provides a range of services to help implement Soft Landings successfully throughout all stages of a project.
Legal experts from Clarkslegal and Michelle will identify:
strategies to understand and reduce risk;
how to manage your legal risks and the risk of insolvency;
the Soft Landings process from a technical and legal perspective.
Recommended Reading

Offgrid to trial ZincGel long-duration battery at Keele
Offgrid Energy Labs and Keele University plan to test a unique zinc-bromine battery produced in the UK.

Gridserve takes first UKPN flexible demand connection through an IDNO
UK Power Networks says the arrangement at Cobham will allow the EV charging hub to use available network capacity without overloading the network.

Enel X to aggregate Threefold commercial batteries for grid services
A five-year agreement will initially bring around 3.5MW of behind-the-meter battery capacity into Enel X’s virtual power plant.