Nexans keeps energy transmission flowing
Temporary site cables can prevent costly interruptions to the power supply during upgrade work or repairs on energy networks, Nexans have designed leads specifically to connect equipment in a high-voltage (132kV) system on a temporary basis .
Due to the widespread introduction of renewable energy sources to the transmission network upgrade work is becoming more common whilst the requirement to maintain a constant supply is paramount.
Ideal as a bypass during construction or repair and servicing work Nexans temporary leads are supplied on special three chamber drums to make transportation and handling easier. Flexible silicone rubber outdoor terminations facilitate use in any position and thanks to their low weight, the terminations can be operated without additional support. Temporary leads have the same design as high voltage cables but with reduced insulation thickness, this facilitates a small bending radius making them easy to handle and install.
Nexans manufactures temporary cables in a variety of lengths across three voltage ranges, 110kV, 132kV and 220kV. Further information is available upon request
Nexans
01908 250840
Recommended Reading

Can the grid keep pace with the UK's data centre ambitions?
With demand surging, Eclipse Power’s Charles Deacon explores whether grid reform can unlock the power needed for the UK’s data centre ambitions.

Great British Grid: What’s the point?
The Government says its new publicly owned grid investor will speed up connections and increase competition, but how?

Electricity networks told to consider UK jobs and skills during procurement
Pressure on electricity networks to support UK jobs and skills through procurement could lead to legislation if voluntary action falls short.