London hospital electrical wiring contract
Apex Wiring Solutions has won the contract to supply a modular wiring system for the redevelopment of St Bartholomew's Hospital (Barts) in London.
Apex Wiring Solutions has won the contract to supply a modular wiring system for the redevelopment of St Bartholomew's Hospital (Barts) in London.
Modular wiring has again been specified to cut electrical installation times, reduce onsite waste and provide a prewired factory tested power and lighting system.
A pre-assembled and fully tested modular system has been specified instead of a more traditional conduit, trunking and hard wired system, eliminating the need for on site electrical connections and cutting the number of qualified electricians required to carry out the work.
The system features pre-wired factory tested pluggable distribution boards to supply lighting and high and low level power for the hospital.
The use of prefabricated connectors and preassembled cables provides a high performance, reliable and flexible wiring solution which will deliver significant improvements over alternative systems, reducing onsite installation times by up to 70%.
Apex Wiring Solutions
0191 378 7900
www.apexwiringsolutions.co.uk
Recommended Reading

Why green technology demands a new approach to electrical safety
As buildings generate, store and consume power in new ways, Richard Winter explores why electrical safety needs to evolve with electrification.

Electrical safety doesn’t end with the inspection
Dan Sedgwick argues that electrical safety depends on more than the inspection – the records must survive long enough to support what comes next.

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.
