Utility control centre
Design verified - These are the key words from the new IEC assembly standards 61439-1 &2:2009. In the past much emphasis has been placed on obtaining an ASTA Certificate, which covers the short circuit withstand capability of an assembly.
What about the earthing system? Temperature rise? Impulse withstand? Insulation properties? The new standard addresses all these other requirements in a comprehensive way ensuring that all characteristics are treated with the respect they deserve, and every enclosure design must be verified against the appropriate test criteria. Rolla have approached the design of the new utility control centre with this in mind, and all verifications on the basic enclosure and busbar system have been done by testing (not by calculation, not by design rules) giving our customers and end users greater peace of mind. Rolla UCC - design verified.
For more information contact sales@rolla.co.uk www.rolla.co.uk
Recommended Reading

Are building operators owning their systems – or just renting access?
Who really controls a building once it is operational? Chris Timmins of IOTech Systems explores the growing case for open, edge-led systems.

ABB could have a big role to play in Rolls-Royce's SMR deployment
The exploratory MoU comes as site-specific design advances for the first three planned UK units at Wylfa.

Can automation help electrical contractors stop delays before they start?
Greg Edge, Managing Director at Edge Electrical Solutions, explores how structured data and automation can help contractors prevent costly delays.
