• Seven steps for survival

    With the current 2018 record-breaking summer heatwave potentially stretching on into August, Bsria has created a seven steps to surviving in buildings, factory, office and workplace alike guide:

    * Installation of external solar shading – technicalities, practicalities and location allowing. 

    * Installing glazing that reduces solar gain – possibly 'green' foil that reflects high levels of radiant heat.