Skip to content Skip to footer

Tag: power cables

Electrical Review Logo

Nexans keeps energy transmission flowing

Temporary site cables can prevent costly interruptions to the power supply during upgrade work or repairs on energy networks, Nexans have designed leads specifically to connect equipment in a high-voltage (132kV) system on a temporary basis . Due to the widespread introduction of

Stay In The Know

Get the Electrical Review Newsletter direct to your inbox, and don't miss a thing.